Mars Storm Water Management Pond

Expansion of this existing storm water management pond in Bolton to 1.8 ha, was required for the development of a large distribution facility in the catchment area of the existing pond. Design and implementation was completed in accordance with the Stormwater Management Practices and Design Manual as outlined by MOEE, incorporating 5-zone planting requirements to Town of Caledon and Credit Valley Conservation standards.

We worked with the Town and Conservation Authority to balance the provision of appropriate habitat for Canada Goose populations with the long-term viability of the vegetation specified for the pond.” The pond expansion was completed and assumed by the Town of Caledon in 2009.